Work under this contract covered the Rehabilitation of the existing Wharf facility, including – upgrading of Armour Stone slope protection at Ro/Ro berth and Main Wharf, replacement of Copewall, repairs to Bollard bases and replacement of slab-on-grade Concrete Deck.
Specifics included:
¨ Demolition, removal and disposal of existing Deck Slab, Dolphin Walkway Footing and Copewall.
¨ Excavation and backfilling of Copewall, Bollard Base and new Deck Slab.
¨ Dredging Operations.
Removal and disposal of existing Slope Protection Underlayer and Bedding layer, grading for installation of new Protection and removal of Armour units.
Installation of new Bedding layer, Underlayer, Geotextile and Armour stone cover layer.
Bollard Base repairs.
Installation of Steel Sheet Piling Wall.
Cast-in-place Concrete and placement of Concrete Deck.
Installation of Wall Anchorage System.
Replacement of Dolphin Walkway Footing and re-installment of Rail Tracks.
Deep Water Port Rehabilitation
February 1996 - December 1996: Deep Water Port Rehabilitation - St. Kitts
Client: St. Kitts Air and Sea Ports Authority
Consultant: Novaport International, Canada