Project Details
The project involved the Construction of Infrastructure and Utility works; the main elements being:
Construction of Roadworks inclusive of excavation, filling sub-base, base and wearing course, top-soiling to edge of ROW and miscellaneous intersections and mediums.
Construction of reinforced concrete culverts, box culverts, earthen drains and catchpits.
Water reticulation inclusive of 100 mm and 150 mm P.V.C. Water Mains installation, gate valves, air release valves, washout assembly, disinfection, fire hydrant and lot connections to the Water and Sewerage Authority.
Sewer installation inclusive of Gravity and Force Mains, manholes, cleanouts, road crossings, 100 mm, 150 mm and 200 mm P.V.C. pipes, wet wells, lift stations and submersible pumps.
Construction and installation of electrical and telephone manholes and ducts.
Slope Protection by construction of rip-rap protection of side slopes, entrances and exits to drainage channels.