Project Details
The project required the Rehabilitation of the existing Wharf structure and the addition of a new Wharfage area off the St. George’s Harbour.
Specifics of the project were inclusive but not limited to the following:
v Demolition and Removal of existing structures.
v Excavation and Backfilling.
v Dredge Operations.
v Fabrication and Installation of Formwork for Cast-in-Place concrete.
v Steel Sheet piling and other Steel reinforcement works.
v Cast-in-Place concrete.
v Armour stone and Geotextile placement.
v Installation of Water line, Storm Sewer lines, Manholes and Catch Basins.
v Installation of Security Fencing.
v Installation of Asphaltic Slag Apron.
v Installation of Interlocking Concrete Paving Stones.

|
|
|
||||||||
![]() |
|
||||||||
|
|
|||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||
![]() |
|||||||||
![]() |
|||||||||
|
|
|||||||||
Port Expansion- Grenada September 1997 - July 1999: Port Expansion – St. George’s, Grenada Client: Grenada Ports Authority Consultant: Novaport International, Canada
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|